Coastal Lancashire — Blackpool, Fylde, Wyre and Morecambe Bay — combines substantial regeneration pipeline with the unique technical challenges of coastal new-build. Wind loading, salt-air corrosion and storm-resilience all affect the FHS-compliant solar PV specification. We have installed across the Fylde Peninsula and the Morecambe Bay coastline, with upgraded mounting hardware and corrosion-resistant components as standard for postcodes within 5 km of the shoreline.
Major housing schemes across Coastal Lancashire
| Scheme | Plots | Lead | Status |
|---|---|---|---|
| Blackpool Town Centre regen | 1,100 | Blackpool Council / Multiple | Phase 1 build out 2026 |
| Heyhouses Lane (St Annes) | 350 | Story Homes | Phase 2 delivery |
| Marsh Mill (Thornton) | 420 | Anwyl Homes | Construction underway |
| Bay Gateway (Heysham) | 280 | Multiple housebuilders | Outline consent 2026 |
Coastal Lancashire planning context
The Fylde coast presents specific technical considerations for FHS-compliant solar PV. Wind zone 3-4 ratings (vs the wind zone 1-2 inland) require upgraded mounting hardware certified to higher wind loads. Salt-air corrosion affects aluminium framing and exposed electrical connectors — we specify marine-grade powder-coat finishes on mounting hardware and IP66-rated junction boxes throughout coastal postcodes. The Blackpool Town Centre regeneration is the largest single FHS-spec opportunity in the area, with mixed-use schemes incorporating new-build dwellings above ground-floor retail. The South Promenade redevelopment pipeline (Phase 2 and beyond) is anticipated to add ~2,000 dwellings through to 2032 — all FHS spec post-March 2027.
Planning authorities served
Why work with us in Coastal Lancashire
We operate across Lancashire with installation crews servicing Coastal Lancashire from regional depots. Per-plot pricing locked at procurement, factory pre-fit on panelised roof cassettes, SAP/HEM modelling delivered to align with local planning authority preferences. NHBC, LABC and Premier Guarantee all accepted across the sub-region. Active framework agreements with multiple Lancashire-based volume housebuilders.
For the county-wide overview see our Lancashire county page; for full FHS specification detail see the FHS pillar guide.