Are gas boilers banned in new builds? In practice, yes, from 24 March 2027 in England — UK new build solar PV installation
Future Homes Standard

Are gas boilers banned in new builds? In practice, yes, from 24 March 2027 in England

Are gas boilers banned in new builds? Not by name, but Part L 2026 targets rule them out from 24 March 2027. Dates, what replaces them, and existing homes.

Gas Boiler Ban in New Builds: 2027 Rules — Future Homes Standard guidance for new builds

Are gas boilers banned in new builds? Not by name, but in practice yes. From 24 March 2027, new homes in England must meet the Part L 2026 energy and carbon targets, which are set by a notional home with low-carbon heating, and a new home heated by a gas boiler cannot meet them. So gas boilers are, in effect, banned in new builds, and heat pumps and heat networks take their place. Existing homes are different: gas boilers can still be fitted and replaced there.

Is it a legal ban?

No. Approved Document L 2026 does not name gas boilers or prohibit them. Instead, each new home is compared with a notional dwelling of the same size and shape, and must match its target emission rate, target primary energy rate and target fabric energy efficiency rate. Those targets are set with low-carbon heating, so a home that burns gas for its heating falls short. The effect is the same as a ban, which is why the change is widely described as one.

When it starts: the dates that matter

Part L 2026 takes effect on 24 March 2027 for building work that is not higher-risk building work, and on 24 September 2027 for higher-risk building work. A home can still be built to the previous rules, gas boiler included, only where a building notice, initial notice or full plans application was given before 24 March 2027 and work on that building starts before 24 March 2028 (Building Circular 01/2026). Protection is assessed building by building, so on a phased site the later plots can fall under the new rules.

Why a gas boiler cannot meet the targets

A gas boiler turns each unit of gas into slightly less than one unit of heat, and every unit of gas burned releases carbon at the home. A heat pump moves heat from the outside air, delivering several units of heat for each unit of electricity, and the carbon in grid electricity keeps falling. Measured against targets built around low-carbon heating, the gas-heated home loses on both emissions and primary energy.

Hydrogen-ready and hybrid boilers

A "hydrogen-ready" boiler burns natural gas until a hydrogen supply exists, so for compliance it is still a gas boiler. A hybrid system pairs a heat pump with a gas boiler, keeping a gas connection and a boiler that the notional dwelling does not have. In practice new-build specifications have moved to a heat pump on its own or a heat network connection.

What replaces gas boilers in new builds

Air source heat pumps are the usual choice for houses, with a hot water cylinder and controls. Heat networks suit dense urban schemes where a communal system serves many homes. Ground source heat pumps work well where there is land or a shared ground loop. Paired with the solar PV that requirement L3 of Part L 2026 now expects, a heat pump can run partly on electricity generated on the roof.

Existing homes: no ban on gas boilers

The new-build rules do not affect existing homes. The Warm Homes Plan published in January 2026 did not bring in the previously proposed ban on new gas boilers being fitted in existing homes after 2035, so boiler replacements remain allowed. Homeowners switching to a heat pump can apply for the Boiler Upgrade Scheme: £7,500 towards an air source or ground source heat pump, or £9,000 until 31 March 2027 for homes heated by oil or LPG without mains gas (the standard £7,500 plus an additional £1,500).

Self-builders and the Boiler Upgrade Scheme

New builds that a developer is still building are not eligible for the Boiler Upgrade Scheme. Self-builds are: the scheme accepts a self-build property if you built it yourself or paid a builder to build it, and it has never been owned by a business or organisation. For a self-builder installing a heat pump to meet Part L 2026, that grant can be worth checking before the heating is specified.

Scotland and Wales

Scotland moved first: its New Build Heat Standard has required zero direct emissions heating in most new buildings since April 2024. Wales has published its own Approved Document L (2026), so check the Welsh Government's guidance for its dates. The rules on this page apply in England.

What it adds to the cost of a new home

The Government's Impact Assessment puts the whole Future Homes Standard premium at about £4,350 per dwelling at 2025 prices, covering the heat pump, the solar PV, ventilation and fabric changes together. Running costs depend on the heat pump's efficiency, the tariff and how much of the heating the roof-top PV can supply.

Frequently asked questions

Are gas boilers banned in new builds?
Not by name, but in practice yes in England from 24 March 2027. Part L 2026 sets energy and carbon targets based on a notional home with low-carbon heating, and a new home heated by a gas boiler cannot meet them.
Can you still put a gas boiler in a new house?
Only if the home is built under the transitional rules: a building notice, initial notice or full plans application given before 24 March 2027, with work on that building starting before 24 March 2028. Otherwise the home must meet Part L 2026, which a gas-heated home cannot.
Will gas boilers be banned in existing homes?
No ban is planned. The Warm Homes Plan published in January 2026 did not introduce the previously proposed ban on new gas boilers being fitted after 2035, so replacements in existing homes remain allowed.
Is a hydrogen-ready boiler allowed in a new build?
It is treated as a gas boiler, because it burns natural gas until a hydrogen supply exists, so it does not help a new home meet the Part L 2026 targets.
Can a self-builder get a grant for a heat pump?
Yes, potentially. The Boiler Upgrade Scheme accepts self-build properties that you built yourself or paid a builder to build and that have never been owned by a business. It pays £7,500 towards an air source or ground source heat pump.
40% of ground floor area
PV / ground floor area
Mar 2027
FHS in force
75%
CO₂ vs 2013 baseline
£4,350 per dwelling
Per-plot premium (2025 prices, FHS Impact Assessment)
For developers and housebuilders

Gas boiler ban in new builds: 2027 rules on volume new-build programmes

On a multi-plot programme, settle four things at procurement: the per-plot price and how it moves with inflation; whether the array is modelled in the SAP 10.3 calculation for every house type; what your structural warranty provider needs to see for roof-integrated PV; and who issues the MCS certificate at handover, since buyers need it to claim Smart Export Guarantee payments.

For self-builders and architects

Gas boiler ban in new builds: 2027 rules for one-off custom builds

On a one-off build the array is easiest to settle at RIBA Stage 2 or 3, while the roof geometry is still open. Your SAP assessor models the system for the Part L submission, your building control body signs it off, and PV installed as part of constructing a new dwelling is zero-rated for VAT under HMRC Notice 708.

How this fits into the FHS compliance pathway

Every FHS-compliant new build passes three regulatory gates. Gas boiler ban in new builds: 2027 rules sits mainly in the second, design-stage Part L compliance, but it affects building control sign-off and the handover documents too:

  1. 1
    Planning permission Solar PV designed into a new dwelling is normally covered by the dwelling's own planning permission. Conservation areas, Article 4 directions and plots within the curtilage of a listed building need extra planning evidence, usually prepared by the architect or planning agent.
  2. 2
    Building control: Part L compliance SAP 10.3 is the compliance calculation at FHS launch. The dwelling's emission and primary energy rates must meet their targets, with the PV array, heat pump, fabric U-values and air permeability all entered. The SAP assessor prepares the design-stage and as-built calculations that building control reviews.
  3. 3
    Completion: certificates and handover The MCS certificate (needed for Smart Export Guarantee payments), the Energy Performance Certificate and the homeowner's handover documents. If your structural warranty provider has requirements for roof-integrated PV, confirm them before the roof goes on.

For a fuller walkthrough of the compliance process, see the Part L 2026 guide and the FHS PV calculator, which sizes a compliant array from your ground floor area.

Calculate your plot

FHS PV Calculator

Enter your ground floor area — get the 40%-rule minimum kWp, panel count and indicative cost in 30 seconds.

Open calculator →
Get costed

Free, no-obligation quote

Share your plot details, postcode and target start on site, and a solar installer can price an FHS-compliant system.

Request quote →
FHS in force from 24 March 2027

Get a quote for FHS-compliant solar

Share your plot details and a solar installer can price a system sized to the Part L 2026 notional dwelling, with PV area equal to 40% of the ground floor area. There is no obligation to go ahead.

  • ✓ Sized to the 40% ground-floor-area rule
  • ✓ For developer programmes and one-off self-builds
  • ✓ Check any installer against the MCS register before you sign