Solar PV system design drawings for a UK new build
Design guide

Solar system design services for UK new builds and custom builds

What a solar system design package should include, when to start it, and what to ask for: sizing to the FHS 40% rule, a 3D layout, SAP 10.3 modelling and the documents building control needs.

Quick answer

Solar system design covers everything before installation: array sizing, a 3D layout with shading analysis, SAP 10.3 compliance modelling, inverter and battery specification, and the documents building control needs. On a new build it is done by the installer's design team or an independent designer, working with the architect from RIBA Stage 2.

What a design package should include

  1. 1Plot or scheme assessment. A review of the drawings, the ground floor area, roof orientation and a shading study from satellite imagery and neighbouring buildings.
  2. 2Array sizing. The FHS 40% ground-floor-area rule as the starting point, plus any over-size you choose for household demand, an EV or a future battery.
  3. 33D solar PV design. Panel placement on a roof model, an annual and monthly generation estimate, and the shading impact through the year.
  4. 4SAP 10.3 modelling. The Part L 2026 compliance calculation, done by an accredited energy assessor, with the array entered exactly as designed. (The Home Energy Model has been postponed and is not yet an approved route.)
  5. 5Inverter and battery specification. A hybrid inverter sized to the array and any future battery, and a battery size matched to household load and tariff.
  6. 6Building control documents. The SAP calculation, panel and inverter data sheets, and the mounting system details, ready for the local authority or registered building control approver.

RIBA stages and the right starting point

When solar design starts decides how much it can shape the building:

RIBA StageDecisions still openWhat solar design can still do
2 — Concept DesignRoof geometry, glazing ratio, plot orientationShape architectural decisions for the best array
3 — Spatial CoordinationM&E layout, inverter location, service routingCoordinate PV with the other building services
4 — Technical DesignPanel make and model, mounting systemSpecify the system within the existing design
5 — Manufacturing and ConstructionInstallation programme onlyLittle room left: the system must fit what is already designed

For self-builders, Stage 2 is the time to start if at all possible: there is far more room to optimise the roof for the array while the design is still open.

Custom solar systems for non-standard projects

A standard 3-bed semi with a south-facing pitched roof is straightforward, but architect-led projects often are not. Common non-standard cases include flat-roof self-builds with ballasted or tilted arrays; replacement dwellings in National Landscapes using BIPV slate; modular (MMC) homes where the array is fitted in the factory; homes designed well beyond the FHS minimum; mixed-use schemes with shared arrays; and infill plots in conservation areas. The method is the same; the constraints differ.

For volume housebuilders, design is done once for each house type and repeated across the plots of that type, so the design cost per plot falls as the plot count rises.

Solar roof design: getting the roof right first

Solar roof design is where the biggest generation and appearance decisions are made, and on a new build they are made at the drawing board rather than retrofitted onto a finished roof. Three roof-design variables set the outcome: orientation and pitch (a south-facing roof at 30–40° maximises annual yield, while an east-west split often suits the plot better at the cost of some output), the integration method, and how the array reads from the street. Working the solar roof design out with the architect lets the panels complement the elevation rather than fight it.

The integration choice is the heart of solar roof design. In-roof panels sit flush in the tile line and are the usual choice for a clean modern roofline; solar roof tiles (BIPV) make the array far less visible for conservation areas and heritage plots; and the architectural solar design guide covers bespoke geometry, colour-matched panels and solar canopies. Each route should be checked for both generation and appearance before a tile is ordered.

Designing the roof and the PV together also resolves the practical clashes that derail retrofit: rooflight and dormer positions, valley and hip losses, panel setbacks from ridges and verges, and cable routes to the inverter, all fixed on the drawing before the roof is built.

Tools and outputs to ask for

Designers commonly use PVsyst for production modelling and shading analysis, OpenSolar for 3D plot-level layout, SketchUp for visualisation and approved SAP software, such as Elmhurst Design SAP, for the compliance calculation. Ask for a PDF design report, the 3D model in SKP or DWG, the production report and the SAP calculation.

To request a quote, use the form below. For an initial cost estimate sized to your plot, use the FHS PV calculator.

40% of ground floor area
PV / ground floor area
Mar 2027
FHS in force
75%
CO₂ vs 2013 baseline
£4,350 per dwelling
Per-plot premium (2025 prices, FHS Impact Assessment)
For developers and housebuilders

Solar system design on volume new-build programmes

On a multi-plot programme, settle four things at procurement: the per-plot price and how it moves with inflation; whether the array is modelled in the SAP 10.3 calculation for every house type; what your structural warranty provider needs to see for roof-integrated PV; and who issues the MCS certificate at handover, since buyers need it to claim Smart Export Guarantee payments.

For self-builders and architects

Solar system design for one-off custom builds

On a one-off build the array is easiest to settle at RIBA Stage 2 or 3, while the roof geometry is still open. Your SAP assessor models the system for the Part L submission, your building control body signs it off, and PV installed as part of constructing a new dwelling is zero-rated for VAT under HMRC Notice 708.

How this fits into the FHS compliance pathway

Every FHS-compliant new build passes three regulatory gates. Solar system design sits mainly in the second, design-stage Part L compliance, but it affects building control sign-off and the handover documents too:

  1. 1
    Planning permission Solar PV designed into a new dwelling is normally covered by the dwelling's own planning permission. Conservation areas, Article 4 directions and plots within the curtilage of a listed building need extra planning evidence, usually prepared by the architect or planning agent.
  2. 2
    Building control: Part L compliance SAP 10.3 is the compliance calculation at FHS launch. The dwelling's emission and primary energy rates must meet their targets, with the PV array, heat pump, fabric U-values and air permeability all entered. The SAP assessor prepares the design-stage and as-built calculations that building control reviews.
  3. 3
    Completion: certificates and handover The MCS certificate (needed for Smart Export Guarantee payments), the Energy Performance Certificate and the homeowner's handover documents. If your structural warranty provider has requirements for roof-integrated PV, confirm them before the roof goes on.

For a fuller walkthrough of the compliance process, see the Part L 2026 guide and the FHS PV calculator, which sizes a compliant array from your ground floor area.

Solar system design FAQ

What does solar system design include?
A complete design package covers: (1) a plot or scheme assessment from the drawings; (2) array sizing against the FHS 40% notional-dwelling rule, plus any agreed over-size; (3) a 3D roof layout with shading analysis and an annual generation estimate; (4) the SAP 10.3 compliance modelling, or input to it; (5) inverter and battery sizing matched to the expected household load; and (6) the documents building control will ask for.
When in the build programme should solar design start?
RIBA Stage 2 (concept design) is the best time, early enough to influence roof geometry, glazing and orientation. Stage 3 (spatial coordination) is the latest comfortable point. After Stage 4 a compliant system can still be designed, but the chance to shape the building around the array has gone. Volume housebuilders design once per house type rather than per plot.
How much does solar system design cost?
It varies with the project. On a one-off build, design is often included in the installer’s quote; independent design-only commissions are priced separately. For volume housebuilders the design is done once per house type, so its cost per plot falls as the plot count rises. Ask for the design to be itemised so quotes can be compared.
Should I ask for a 3D solar panel design?
Yes. A 3D layout showing panel placement and shading, with an annual generation estimate, lets the architect check the elevation and the numbers before the roof is built. Ask for the model in a format your architect can use, such as SKP or DWG.
What is solar roof design?
Solar roof design is designing a roof and its PV array together, so the panels maximise generation and suit the elevation instead of being bolted onto a finished roof. It covers orientation and pitch (south-facing at 30–40° for peak yield, or an east-west split to suit the plot), the integration method (in-roof, solar roof tiles or on-roof), and setbacks, valleys and cable routes. On a new build it is done at the drawing board, which is why new-build solar usually looks and performs better than retrofit.
What is the difference between design and installation?
Design covers everything before work starts on site: sizing, modelling, compliance documents and the procurement specification. Installation is the on-site work, commissioning, MCS certification and handover. Many installers offer both as one package; independent designers offer design-only work for clients who already have an installer.
FHS in force from 24 March 2027

Request a quote for solar system design

Share your plot details and a solar installer can price a system sized to the Part L 2026 notional dwelling, with PV area equal to 40% of the ground floor area. There is no obligation to go ahead.

  • ✓ Sized to the 40% ground-floor-area rule
  • ✓ For developer programmes and one-off self-builds
  • ✓ Check any installer against the MCS register before you sign

Request a quote

A few details about the plot help an installer price it accurately.

By sending this form you agree to our privacy policy. Your details may be passed to a solar installer so they can respond.

Designing for volumetric or panelised construction? MMC and modular solar design sets out the weight bands and Eurocode load combinations to design to.