Solar PV for housing developments and housebuilders
Build a plot schedule: the Part L 2026 reference array for every house type, which edition of Part L each plot falls under, and the published cost per kWp, with a spreadsheet download.
Build a PV schedule for your plots
List each house type with its number of plots, whether the building notice, initial notice or full plans application has been given, and when you expect to commence. The schedule shows the reference array for each line (equation 5.1 of Approved Document L 2026), which edition of Part L each line falls under, and the two published per-kWp rates. Download it as a spreadsheet file. Flats are sized differently: see the flats guide.
| Line (optional label) | House type | Ground floor m² | Plots | Notice or application | Expected commencement | Remove |
|---|
| Line | Part L edition | kWp per plot | Panels per plot | Total kWp | Build stage | Retrofit average |
|---|
Add a line to see the schedule.
Reference array: Approved Document L 2026, Volume 1, paragraph 5.73 and equation 5.1. It is a target for annual output, not a panel count, and it applies to plots that fall under Part L 2026 (requirement L3); a roof that cannot take it has the reasonably-practicable-area route in paragraph 5.73(b). Panels at 425 W each, for scale only. Build stage about £1,200 per kWp (Spirit Energy); retrofit average £2,020 per kW (DESNZ solar PV cost data, 2025/26, per kW of declared net capacity). PV array only, before VAT, indicative. A building stays on the 2021 edition only if its notice or application was given before 24 March 2027 and it is commenced before 24 March 2028, judged building by building; commenced means the foundations, any basement and the ground floor structure are complete. Applies to England. Nothing you enter here is sent anywhere unless you use the enquiry form below.
Six procurement questions to settle before you sign
Standard house types need redesigning to carry a heat pump and a PV array, and every house type needs SAP 10.3 modelling against the new targets. Per-plot costs for PV and heat pumps have to be priced into land bids written now, for homes that will commence after the transitional period. The schedule above gives the reference array and the two published cost rates for each house type.
The practical answer is to settle the six items opposite at procurement rather than on site. Each one is a question to put to any installer or supplier before you sign, and the evidence to ask for is in the Approved Document: a design-stage and an as-built BREL report, with photographs of each detail on each plot (Appendix B).
The per-plot price
Agree what it includes (panels, inverter, mounting, monitoring, MCS certification, commissioning) and how it moves over the build programme.
In-roof and the roofer
In-roof arrays replace the tiles they cover, so the roofing contractor and the solar installer need one programme and one flashing detail.
SAP 10.3 for every house type
Design-stage SAP for each house type and as-built SAP for each plot, with the array entered exactly as installed.
Warranty provider requirements
Confirm your structural warranty provider’s requirements for roof-integrated PV before the roof design is fixed.
Grid connection
Each home’s PV is notified to the network operator under G98 (up to 16 A per phase) or needs G99 approval above that. On large sites, raise capacity with the DNO early.
MCS certificates at handover
Every plot needs its MCS certificate so buyers can claim Smart Export Guarantee payments.
Which Part L applies to a plot
Part L 2026 applies in England from 24 March 2027. A building stays on the 2021 edition only if the building notice, initial notice or full plans application for that building was given before 24 March 2027 and the building is commenced before 24 March 2028 (Building Circular 01/2026). Commenced has a defined meaning: the foundations, any basement and the ground floor structure must be complete. The test is applied building by building, not site by site, so on a phased scheme the later plots can fall under Part L 2026 even where the first plots are protected.
Enter each phase in the schedule above to see the result for your programme, or read the guide to which Part L applies to my plot for the rules in full. Higher-risk building work has its own later dates and the FHS compliance checker covers it.
Flats and mixed schemes
The schedule sizes houses from their own ground floor area. For a block of flats, Approved Document L 2026 sets the reference array from the building's ground floor area or from each dwelling's allocated share, with a fallback where the roof is too small. The guide to solar panels for new build flats works through a four-storey example from the Approved Document's own equations. Modular and MMC schemes have their own weight and programme questions; the solar for modular buildings supplier checklist covers them. For a scheme in Bedford, the network operator, the adopted local plan, the permitted sites and the yield are set out in the Bedford new-build solar guide.
The developer workflow
Where solar fits a development programme, from land bid to plot handover.
Land bid stage
Price the FHS premium into the residual land valuation. Indicative per-plot solar pricing from installers is one of the inputs.
Detailed design
House type by house type: array layout, panel count, inverter sizing, cable routing and the SAP 10.3 modelling.
Roof and installation
In-roof trays go on with the roofing. Some panelised roof systems allow the array to be pre-fitted off-site.
Site and handover
Commissioning, network operator notification, the MCS certificate, as-built SAP and EPC, and the buyer’s handover documents.
Developer resources
FHS compliance checklist →
Plot-level checklist for Part L 2026 compliance: design, SAP, building control and handover.
Bulk procurement pricing →
How per-plot pricing works at scale, and what to agree before you sign.
Social housing →
Funding programmes, ownership models and registered provider procurement.
SAP & HEM modelling →
What SAP 10.3 modelling covers for each house type, and where the Home Energy Model fits.
Part L 2026 guide →
What the 2026 Approved Document L changes for a volume programme, and the transitional deadlines.
FHS compliance calculator →
Quick per-plot sizing: enter the ground floor area to get an array size and indicative cost.
Manufacturers you will see on UK new-build specifications
These brands commonly appear in new-build specifications. Before you commit, check the product is MCS-certified and ask your structural warranty provider what it requires for roof-integrated PV.
Frequently asked questions
How do I work out the PV for every plot on a development?
Which edition of Part L applies to a plot that already has a building notice?
When does the Future Homes Standard apply to a development?
Which compliance calculation applies?
How large does the PV array need to be?
What does the FHS add to per-plot cost?
Will a structural warranty provider accept roof-integrated PV?
How do housing associations procure solar?
Ask about solar across your site
Share your site, plot count and house types, and we reply by email with the Part L 2026 reference PV for each house type, where your plots sit against the 2027 and 2028 dates, and the questions to put to installers.
- ✓ Sized with equation 5.1 of Approved Document L 2026
- ✓ For developer programmes, contractors, architects and self-builds
- ✓ Check any installer against the MCS register before you sign