Solar PV for housing developments and housebuilders — UK new build solar PV installation
For housebuilders & developers

Solar PV for housing developments and housebuilders

Build a plot schedule: the Part L 2026 reference array for every house type, which edition of Part L each plot falls under, and the published cost per kWp, with a spreadsheet download.

40%
PV area / ground floor area
Part L 2026 notional dwelling
£4,350
FHS premium per dwelling
Impact Assessment, 2025 prices
24 Mar 2027
FHS in force
24 Mar 2028
Transitional period ends
Plot schedule · result on this page · houses

Build a PV schedule for your plots

List each house type with its number of plots, whether the building notice, initial notice or full plans application has been given, and when you expect to commence. The schedule shows the reference array for each line (equation 5.1 of Approved Document L 2026), which edition of Part L each line falls under, and the two published per-kWp rates. Download it as a spreadsheet file. Flats are sized differently: see the flats guide.

Plot schedule inputs
Line (optional label) House type Ground floor m² Plots Notice or application Expected commencement Remove
Go to the enquiry form with this schedule →
Plot schedule result
Line Part L edition kWp per plot Panels per plot Total kWp Build stage Retrofit average

Add a line to see the schedule.

Reference array: Approved Document L 2026, Volume 1, paragraph 5.73 and equation 5.1. It is a target for annual output, not a panel count, and it applies to plots that fall under Part L 2026 (requirement L3); a roof that cannot take it has the reasonably-practicable-area route in paragraph 5.73(b). Panels at 425 W each, for scale only. Build stage about £1,200 per kWp (Spirit Energy); retrofit average £2,020 per kW (DESNZ solar PV cost data, 2025/26, per kW of declared net capacity). PV array only, before VAT, indicative. A building stays on the 2021 edition only if its notice or application was given before 24 March 2027 and it is commenced before 24 March 2028, judged building by building; commenced means the foundations, any basement and the ground floor structure are complete. Applies to England. Nothing you enter here is sent anywhere unless you use the enquiry form below.

What changes for developers

Six procurement questions to settle before you sign

Standard house types need redesigning to carry a heat pump and a PV array, and every house type needs SAP 10.3 modelling against the new targets. Per-plot costs for PV and heat pumps have to be priced into land bids written now, for homes that will commence after the transitional period. The schedule above gives the reference array and the two published cost rates for each house type.

The practical answer is to settle the six items opposite at procurement rather than on site. Each one is a question to put to any installer or supplier before you sign, and the evidence to ask for is in the Approved Document: a design-stage and an as-built BREL report, with photographs of each detail on each plot (Appendix B).

The per-plot price

Agree what it includes (panels, inverter, mounting, monitoring, MCS certification, commissioning) and how it moves over the build programme.

In-roof and the roofer

In-roof arrays replace the tiles they cover, so the roofing contractor and the solar installer need one programme and one flashing detail.

SAP 10.3 for every house type

Design-stage SAP for each house type and as-built SAP for each plot, with the array entered exactly as installed.

Warranty provider requirements

Confirm your structural warranty provider’s requirements for roof-integrated PV before the roof design is fixed.

Grid connection

Each home’s PV is notified to the network operator under G98 (up to 16 A per phase) or needs G99 approval above that. On large sites, raise capacity with the DNO early.

MCS certificates at handover

Every plot needs its MCS certificate so buyers can claim Smart Export Guarantee payments.

Which Part L applies to a plot

Part L 2026 applies in England from 24 March 2027. A building stays on the 2021 edition only if the building notice, initial notice or full plans application for that building was given before 24 March 2027 and the building is commenced before 24 March 2028 (Building Circular 01/2026). Commenced has a defined meaning: the foundations, any basement and the ground floor structure must be complete. The test is applied building by building, not site by site, so on a phased scheme the later plots can fall under Part L 2026 even where the first plots are protected.

Enter each phase in the schedule above to see the result for your programme, or read the guide to which Part L applies to my plot for the rules in full. Higher-risk building work has its own later dates and the FHS compliance checker covers it.

Flats and mixed schemes

The schedule sizes houses from their own ground floor area. For a block of flats, Approved Document L 2026 sets the reference array from the building's ground floor area or from each dwelling's allocated share, with a fallback where the roof is too small. The guide to solar panels for new build flats works through a four-storey example from the Approved Document's own equations. Modular and MMC schemes have their own weight and programme questions; the solar for modular buildings supplier checklist covers them. For a scheme in Bedford, the network operator, the adopted local plan, the permitted sites and the yield are set out in the Bedford new-build solar guide.

The developer workflow

Where solar fits a development programme, from land bid to plot handover.

01

Land bid stage

Price the FHS premium into the residual land valuation. Indicative per-plot solar pricing from installers is one of the inputs.

02

Detailed design

House type by house type: array layout, panel count, inverter sizing, cable routing and the SAP 10.3 modelling.

03

Roof and installation

In-roof trays go on with the roofing. Some panelised roof systems allow the array to be pre-fitted off-site.

04

Site and handover

Commissioning, network operator notification, the MCS certificate, as-built SAP and EPC, and the buyer’s handover documents.

Examples, not endorsements

Manufacturers you will see on UK new-build specifications

These brands commonly appear in new-build specifications. Before you commit, check the product is MCS-certified and ask your structural warranty provider what it requires for roof-integrated PV.

Panels
JA SolarLONGiTrina SolarRECQ CELLSViridian
Inverters
SunSynkSolarEdgeEnphaseGoodWeFroniusGivEnergy
Heat pumps
DaikinMitsubishi EcodanVaillantSamsung EHSGrant Aerona
Batteries
Tesla PowerwallGivEnergySunSynkSolaXPylontech
EV chargers
Zappi (myenergi)OhmeHypervoltEasee
BIPV systems
GSE IntegrationMarley SolarTileViridian ClearlineGB-Sol PV Slate

Frequently asked questions

How do I work out the PV for every plot on a development?
Size each house type from its ground floor area: the Part L 2026 reference array is 0.22 kWp per m² over 40% of the ground floor area (Approved Document L, paragraph 5.73, equation 5.1). The plot schedule builder on this page applies that to every house type and plot count, shows which edition of Part L each line falls under, and downloads as a spreadsheet file.
Which edition of Part L applies to a plot that already has a building notice?
A building stays on the 2021 edition only if the building notice, initial notice or full plans application for that building was given before 24 March 2027 and the building is commenced before 24 March 2028. Commenced means the foundations, any basement and the ground floor structure are complete. It is judged building by building, so later plots on a phased site can fall under Part L 2026.
When does the Future Homes Standard apply to a development?
From 24 March 2027 in England. Transitional protection applies only where a building notice, initial notice or full-plans application is with building control before 24 March 2027 and that building commences on site before 24 March 2028. It is assessed building by building, not site by site.
Which compliance calculation applies?
SAP 10.3 is the compliance calculation at FHS launch. The Home Energy Model (HEM) was intended to replace SAP, but its launch has been postponed and it is not yet an approved route.
How large does the PV array need to be?
The Part L 2026 notional dwelling for a house carries PV with an area equal to 40% of its ground floor area. The actual dwelling must meet its emission and primary energy targets, which in practice means an array of broadly that size alongside a heat pump.
What does the FHS add to per-plot cost?
The Government Impact Assessment puts the Future Homes Standard premium at about £4,350 per dwelling at 2025 prices, covering the PV array, the heat pump, ventilation and fabric changes together.
Will a structural warranty provider accept roof-integrated PV?
Warranty providers set technical requirements for roof-integrated PV. Check what your provider (for example NHBC, LABC Warranty or Premier Guarantee) requires before the roof design is fixed, and make sure the installer’s documentation meets it.
How do housing associations procure solar?
Registered providers usually buy through procurement frameworks, and schemes may be funded through the Social and Affordable Homes Programme. Some use models in which the landlord keeps ownership of the array. The social housing guide covers the options.
FHS in force from 24 March 2027

Ask about solar across your site

Share your site, plot count and house types, and we reply by email with the Part L 2026 reference PV for each house type, where your plots sit against the 2027 and 2028 dates, and the questions to put to installers.

  • ✓ Sized with equation 5.1 of Approved Document L 2026
  • ✓ For developer programmes, contractors, architects and self-builds
  • ✓ Check any installer against the MCS register before you sign

Send us your site details

We reply by email.

We reply by email. By sending this form you agree to our privacy policy.