The disadvantages of a BIPV solar roof, and when they matter

The real drawbacks of a BIPV solar roof on a new build: cost per kWp, output per square metre, repairs and spares, installer choice and fire ratings.

Solar tiles and slates look like the ideal answer for a new home: the roof generates electricity and nobody can tell. They do have drawbacks, and it is worth knowing them before you specify one. For how a BIPV solar roof compares with in-roof panels overall, including planning and Part L 2026, see the comparison guide.

1. It costs more per kWp

Tile and slate products carry interlocking edges and weatherproofing on every unit. A 2022 guide to building-integrated PV on self-build.co.uk puts it plainly: BIPV modules are "a little more expensive per kWp" than building-applied panels, and solar tiles are "more expensive than panellised" systems. Part of the difference is offset because the PV replaces roof covering you would otherwise buy, so compare quotes net of that credit.

2. It generates less per square metre

A small tile has proportionally less active cell area than a full-size panel, so the same area of roof carries fewer kWp. Under Part L 2026 the target is an output equal to a reference array of 0.22 kWp/m² over 40% of the ground floor area, so a lower-density tile system needs more roof to reach it. On a compact house with a small or complicated roof, check early that the target is achievable.

3. It runs warmer

Tiles and slates sit close to the roof structure with little air moving behind them, while panel arrays have a ventilation gap. PV output falls as cell temperature rises, so an integrated roof gives up a little output on hot days.

4. Repairs need matching units

If a tile or slate is damaged, the replacement has to match both the look and the electrical characteristics of its neighbours. Ask for spare units from the same batch at handover, and ask what happens if the manufacturer discontinues the range.

5. Fewer installers can fit it

A BIPV roof needs roofing and electrical skills working together, and some products are fitted only by installers trained by the manufacturer. Check that the installer and the specific product are MCS certified, because the MCS certificate is what lets the homeowner claim Smart Export Guarantee payments.

6. Fire performance is declared, not pass or fail

Roof-integrated mounting kits are tested under MCS 012, which covers wind loading, reaction to fire and resistance to water penetration. For kits that replace the roof covering, the fire test is test-and-declare: the product states its rating rather than simply passing. Check that the declared rating suits the building and its position on the plot.

When the drawbacks do not matter

In a conservation area, within the curtilage of a listed building or on a design-led custom build, the alternative may be no solar at all or a design the planners will not accept. There, the cost and output penalties are the price of getting PV onto the roof, and the roof-covering credit narrows the gap. On a volume site with no design constraints, in-roof panels are usually the better buy.

40% of ground floor area
PV / ground floor area
Mar 2027
FHS in force
75%
CO₂ vs 2013 baseline
£4,350 per dwelling
Per-plot premium (2025 prices, FHS Impact Assessment)
For developers and housebuilders

The disadvantages of a bipv solar roof, and when they matter on volume new-build programmes

On a multi-plot programme, settle four things at procurement: the per-plot price and how it moves with inflation; whether the array is modelled in the SAP 10.3 calculation for every house type; what your structural warranty provider needs to see for roof-integrated PV; and who issues the MCS certificate at handover, since buyers need it to claim Smart Export Guarantee payments.

For self-builders and architects

The disadvantages of a bipv solar roof, and when they matter for one-off custom builds

On a one-off build the array is easiest to settle at RIBA Stage 2 or 3, while the roof geometry is still open. Your SAP assessor models the system for the Part L submission, your building control body signs it off, and PV installed as part of constructing a new dwelling is zero-rated for VAT under HMRC Notice 708.

How this fits into the FHS compliance pathway

Every FHS-compliant new build passes three regulatory gates. The disadvantages of a bipv solar roof, and when they matter sits mainly in the second, design-stage Part L compliance, but it affects building control sign-off and the handover documents too:

  1. 1
    Planning permission Solar PV designed into a new dwelling is normally covered by the dwelling's own planning permission. Conservation areas, Article 4 directions and plots within the curtilage of a listed building need extra planning evidence, usually prepared by the architect or planning agent.
  2. 2
    Building control: Part L compliance SAP 10.3 is the compliance calculation at FHS launch. The dwelling's emission and primary energy rates must meet their targets, with the PV array, heat pump, fabric U-values and air permeability all entered. The SAP assessor prepares the design-stage and as-built calculations that building control reviews.
  3. 3
    Completion: certificates and handover The MCS certificate (needed for Smart Export Guarantee payments), the Energy Performance Certificate and the homeowner's handover documents. If your structural warranty provider has requirements for roof-integrated PV, confirm them before the roof goes on.

For a fuller walkthrough of the compliance process, see the Part L 2026 guide and the FHS PV calculator, which sizes a compliant array from your ground floor area.

FHS in force from 24 March 2027

Get a quote for FHS-compliant solar

Share your plot details and a solar installer can price a system sized to the Part L 2026 notional dwelling, with PV area equal to 40% of the ground floor area. There is no obligation to go ahead.

  • ✓ Sized to the 40% ground-floor-area rule
  • ✓ For developer programmes and one-off self-builds
  • ✓ Check any installer against the MCS register before you sign

Request a quote

A few details about the plot help an installer price it accurately.

By sending this form you agree to our privacy policy. Your details may be passed to a solar installer so they can respond.