New build housing development in North Yorkshire with rooftop solar PV
Yorkshire sub-region

Solar panels for new builds in North Yorkshire

What the Future Homes Standard means for new homes across North Yorkshire: sizing solar PV to the 40% rule, the planning authorities involved, and local technical checks.

Planning a North Yorkshire development? Request a quote for solar PV on your site.
Free quote →

North Yorkshire is England's largest county by area, and its new-build market runs from the York Central brownfield scheme to market-town extensions around Selby, Harrogate and Northallerton and one-off plots in the Dales and on the moors. The Future Homes Standard applies across all of it from 24 March 2027.

Growth schemes across North Yorkshire

Some of the larger schemes named in local plans and regeneration programmes. Homes on them that commence after the transitional period will be built to the Future Homes Standard.

  • York Central
  • Olympia Park (Selby)

North Yorkshire planning context

North Yorkshire Council became a unitary authority on 1 April 2023, replacing the county council and the seven district councils, and is preparing a single Local Plan for the county outside York; until it is adopted, the former districts' plans still apply. The City of York has its own plan. Plots inside the Yorkshire Dales or North York Moors National Parks are determined by the national park authority, which will look closely at how visible a roof-mounted array is, so in-roof or tile-style systems are worth considering there.

Planning authorities in North Yorkshire

City of York CouncilNorth Yorkshire Council (unitary)Yorkshire Dales National Park AuthorityNorth York Moors National Park Authority

For the county-wide overview see the Yorkshire county page; for full FHS specification detail see the FHS pillar guide.

40% of ground floor area
PV / ground floor area
Mar 2027
FHS in force
75%
CO₂ vs 2013 baseline
£4,350 per dwelling
Per-plot premium (2025 prices, FHS Impact Assessment)
For developers and housebuilders

New-build solar in North Yorkshire on volume new-build programmes

On a multi-plot programme, settle four things at procurement: the per-plot price and how it moves with inflation; whether the array is modelled in the SAP 10.3 calculation for every house type; what your structural warranty provider needs to see for roof-integrated PV; and who issues the MCS certificate at handover, since buyers need it to claim Smart Export Guarantee payments.

For self-builders and architects

New-build solar in North Yorkshire for one-off custom builds

On a one-off build the array is easiest to settle at RIBA Stage 2 or 3, while the roof geometry is still open. Your SAP assessor models the system for the Part L submission, your building control body signs it off, and PV installed as part of constructing a new dwelling is zero-rated for VAT under HMRC Notice 708.

How this fits into the FHS compliance pathway

Every FHS-compliant new build passes three regulatory gates. New-build solar in North Yorkshire sits mainly in the second, design-stage Part L compliance, but it affects building control sign-off and the handover documents too:

  1. 1
    Planning permission Solar PV designed into a new dwelling is normally covered by the dwelling's own planning permission. Conservation areas, Article 4 directions and plots within the curtilage of a listed building need extra planning evidence, usually prepared by the architect or planning agent.
  2. 2
    Building control: Part L compliance SAP 10.3 is the compliance calculation at FHS launch. The dwelling's emission and primary energy rates must meet their targets, with the PV array, heat pump, fabric U-values and air permeability all entered. The SAP assessor prepares the design-stage and as-built calculations that building control reviews.
  3. 3
    Completion: certificates and handover The MCS certificate (needed for Smart Export Guarantee payments), the Energy Performance Certificate and the homeowner's handover documents. If your structural warranty provider has requirements for roof-integrated PV, confirm them before the roof goes on.

For a fuller walkthrough of the compliance process, see the Part L 2026 guide and the FHS PV calculator, which sizes a compliant array from your ground floor area.

FHS in force from 24 March 2027

Get a quote for new-build solar in North Yorkshire

Share your plot details and a solar installer can price a system sized to the Part L 2026 notional dwelling, with PV area equal to 40% of the ground floor area. There is no obligation to go ahead.

  • ✓ Sized to the 40% ground-floor-area rule
  • ✓ For developer programmes and one-off self-builds
  • ✓ Check any installer against the MCS register before you sign

Request a quote

A few details about the plot help an installer price it accurately.

By sending this form you agree to our privacy policy. Your details may be passed to a solar installer so they can respond.