New build solar installers: how developers vet and appoint one
A guide-voice checklist for housebuilders appointing a solar installer: MCS, the SAP inputs, building-control evidence, the roof interface, warranty provider requirements, grid connection and what a per-plot price should include.
This page is a checklist, not an installer
SEO Dons Ltd publishes this site. It is an information publisher, not an installer: it does not supply, fit or quote for solar, it does not recommend an installer, and it takes nothing from one. The questions below are for a developer's own team to put to any installer, and the answers are worth keeping on file for building control, the warranty provider and the buyer. They sit alongside the plot-level compliance checklist and the bulk procurement guide.
What to settle before you appoint an installer
Each question below has the evidence a developer should ask to see. None of it is specific to one installer; it is the same list whether the quote is for twenty plots or two hundred.
| Question to put to the installer | Evidence to ask for |
|---|---|
| Is the installer MCS certified for solar PV, and will every plot get an MCS certificate? | A certificate number you can look up on the MCS register, and a sample plot certificate. The Smart Export Guarantee generally needs a certified installation, so a missing certificate can leave the buyer without export payments. |
| What array details will the energy assessor receive for each house type? | Panel make and model, kWp, orientation, pitch and shading, so the array is entered into the SAP 10.3 or Home Energy Model calculation exactly as installed. Approved Document L requires the generation calculation to use the same version of the approved methodology as the rest of the compliance calculation (paragraph 5.72). |
| What evidence will be produced for building control? | Photographs of each detail on every plot, taken before closing-up, geo-located and with a file name carrying the plot number and detail reference (Approved Document L, Appendix B, B6 to B8). The as-built BREL report is signed by the assessor and by the developer (B4 and B5), and the owner is given a signed copy and the photographic evidence (paragraph 9.5). |
| Who is responsible for the roof around the array? | A written split between the roofer and the PV installer for battens, membrane, flashings and weathering at the array edges, on one programme. In-roof arrays replace the tiles they cover, so the two trades share one detail; on-roof arrays sit above a finished roof covering and the roofer's work is complete first. |
| What does the structural warranty provider require? | The provider's current technical requirements for roof-integrated PV. NHBC, LABC Warranty and Premier Guarantee each publish their own, so ask before the roof design is fixed and ask the installer for the documents the provider will want to see. |
| How is each home connected to the network? | Who notifies the network operator and when. Each home's PV is notified under G98 (up to 16 A per phase) or needs G99 approval above that. On large sites, raise capacity with the network operator early. |
| Which electrical and fire-safety documents will be issued? | The electrical installation certificate and commissioning records. Where on-site generation or storage is installed, the fire safety and electrical requirements of the Building Regulations apply (Approved Documents B and P), and the manufacturer's instructions on locating the equipment should be followed (Approved Document L, note to paragraph 5.75). |
| What does the workmanship warranty cover, and who backs it? | The term, the scope, and whether it is insurance-backed, so that it survives if the installer stops trading. |
| What exactly does the per-plot price include, and how does it move? | A line-by-line scope (panels, inverter, mounting, cabling, isolators, monitoring, commissioning, certification, handover documents), whether SAP modelling is included, and whether the price is fixed for a period or linked to an index over the build programme, in writing before the start on site. |
| Which completed schemes can you check? | Named schemes with a contact at the developer, so that you can ask them directly. A reference you can verify is worth more than a marketing claim. |
Who produces which document
- The installer: the MCS certificate for each plot, the electrical installation certificate and commissioning records, the warranty documents and, with the roofer, photographs of the array details.
- The energy assessor: the design-stage and as-built BREL reports, with the array entered as designed and then as installed. The as-built report is signed by the assessor and by the developer.
- The developer: the programme that sequences the roofer, the installer and the assessor, the warranty provider's sign-off and the handover pack for each buyer.
- The network operator: acknowledgement of each G98 notification or approval of each G99 application.
Roofs: one vetting point, not a product choice
Whether a scheme uses in-roof or on-roof panels changes who owns the weathertightness at the array edge, so it belongs in the appointment conversation. This page does not compare products. For volumetric and panelised schemes, see the guide to lightweight solar installer for modular buildings, and for what a design package should include, the guide to solar system design services. For the reference array each house type needs, use the plot schedule builder, and for the dates that decide which edition of Part L each plot falls under, use the FHS compliance checker.
This guide summarises Approved Document L Volume 1 (2026 edition) and general industry practice. It is not legal or technical advice: confirm requirements with your building control body, warranty provider, energy assessor and network operator.
Developer procurement packages on volume new-build programmes
On a multi-plot programme, settle four things at procurement: the per-plot price and how it moves with inflation; whether the array is modelled in the SAP 10.3 calculation for every house type; what your structural warranty provider needs to see for roof-integrated PV; and who issues the MCS certificate at handover, since buyers need it to claim Smart Export Guarantee payments.
Developer procurement packages for one-off custom builds
On a one-off build the array is easiest to settle at RIBA Stage 2 or 3, while the roof geometry is still open. Your SAP assessor models the system for the Part L submission, your building control body signs it off, and PV installed as part of constructing a new dwelling is zero-rated for VAT under HMRC Notice 708.
How this fits into the FHS compliance pathway
Every FHS-compliant new build passes three regulatory gates. Developer procurement packages sits mainly in the second, design-stage Part L compliance, but it affects building control sign-off and the handover documents too:
- 1 Planning permission Solar PV designed into a new dwelling is normally covered by the dwelling's own planning permission. Conservation areas, Article 4 directions and plots within the curtilage of a listed building need extra planning evidence, usually prepared by the architect or planning agent.
- 2 Building control: Part L compliance SAP 10.3 is the compliance calculation at FHS launch. The dwelling's emission and primary energy rates must meet their targets, with the PV array, heat pump, fabric U-values and air permeability all entered. The SAP assessor prepares the design-stage and as-built calculations that building control reviews.
- 3 Completion: certificates and handover The MCS certificate (needed for Smart Export Guarantee payments), the Energy Performance Certificate and the homeowner's handover documents. If your structural warranty provider has requirements for roof-integrated PV, confirm them before the roof goes on.
For a fuller walkthrough of the compliance process, see the Part L 2026 guide and the FHS PV calculator, which sizes a compliant array from your ground floor area.
Frequently asked questions
Is this site an installer?
What should a per-plot price include?
Should the price be fixed?
What evidence does building control expect for solar on each plot?
Other technology guides
Guides to each part of an FHS-compliant new-build energy system.
In-Roof Solar Integration
How in-roof PV is built into the roof during construction, and why it is the usual specification on FHS-compliant new builds.
Learn more →Building Integrated Photovoltaics (BIPV)
Solar tiles, solar slates and PV-glass facades: when BIPV makes sense on a new build and what to check.
Learn more →SAP & HEM Compliance Modelling
What SAP 10.3 compliance modelling involves for a new build, and where the Home Energy Model fits.
Learn more →Developer Procurement Packages
How per-plot procurement of solar, batteries and heat pumps works across a whole site, and what the price should include.
Learn more →Battery Storage Integration
AC-coupled and DC-coupled batteries on new builds: what they add, and how to size one.
Learn more →EV Charge Point Integration
Solar-aware EV charging that diverts surplus PV to the car instead of exporting it.
Learn more →Heat Pump Integration (ASHP)
Pairing solar PV with an air source heat pump: the standard FHS heating package.
Learn more →Solar Panel Maintenance & Servicing
What aftercare a new-build solar system needs: monitoring, servicing and the warranties that apply.
Learn more →Ask about solar for your new-build site
Tell us about the site, the house types and when you expect to start, and we reply by email. This site is an independent publisher, not an installer.
- ✓ Sized with equation 5.1 of Approved Document L 2026
- ✓ For developer programmes, contractors, architects and self-builds
- ✓ Check any installer against the MCS register before you sign
Send us your site details
We reply by email.