What FHS-ready new builds look like — UK new build solar PV installation
Case studies

What FHS-ready new builds look like

Eight real UK projects — volume developments, garden villages, architect-led self-builds, social housing and BTR. Each one delivered to Future Homes Standard specification ahead of the 2027 deadline.

Eddington Phase 4 — 240-plot urban extension
Volume developer 📍 Cambridge

Eddington Phase 4 — 240-plot urban extension

3.4–5.2 kWp in-roof arrays across 240 dwellings on the University of Cambridge Eddington development. Factory pre-fit on panelised roof cassettes saved 4 weeks of programme. Per-plot installed cost £4,380 — comfortably below the £4,350 FHS premium benchmark when ASHP is included.

Read full case study →
Sherford New Town — 180-plot transition phase
Garden village 📍 Plymouth

Sherford New Town — 180-plot transition phase

Vistry & Persimmon JV. 180 plots in the FHS transition phase delivered to Part L 2026 spec ahead of the regulatory deadline. Mix of 3-bed and 4-bed types with 3.4–6.0 kWp arrays. Full SAP and HEM dual-route modelling.

Read full case study →
Manydown Garden Communities — 120-plot first phase
Volume developer 📍 Basingstoke

Manydown Garden Communities — 120-plot first phase

Urban&Civic-led 3,400-home Garden Community. First phase 120 plots delivered to FHS-equivalent spec from outset. Mix of detached, semi and townhouse types with BIPV solar tiles on 12 architect-led plots.

Read full case study →
Bicester Eco-Town extension — 95 plots
Eco-town 📍 Bicester

Bicester Eco-Town extension — 95 plots

NW Bicester Phase 2. All-electric specification from outset — ASHP heating, MVHR, 4 kWp+ solar PV on every plot. PassivHaus-influenced detailing achieved 1.8 m³/(h·m²) air permeability — well below FHS target.

Read full case study →
Oxford architect-led self-build
Self-build 📍 Oxford

Oxford architect-led self-build

6.8 kWp in-roof array on an architect-designed 230 m² home. Paired with 13 kWh battery, 8 kW ASHP and Zappi EV charger. Annual generation 6,300 kWh; self-consumption 72%. SEG income £140/yr.

Read full case study →
Cotswolds Conservation Area replacement dwelling
BIPV self-build 📍 Cotswolds AONB

Cotswolds Conservation Area replacement dwelling

GB-Sol PV Slate BIPV system on a Cotswold stone replacement dwelling. 5.2 kWp generation, invisible from street elevation. Approved under permitted development with pre-application planning advice.

Read full case study →
60-unit social housing scheme
Social housing 📍 Sheffield

60-unit social housing scheme

LHC framework procurement for a Yorkshire housing association. 60-unit terrace and semi development to AHP 2026 specification — Future Homes Standard equivalent. 3-bed semis with 3.6 kWp arrays, tenant-owned. £42/month average bill reduction.

Read full case study →
Build-to-Rent — 280-unit block, East London
BTR 📍 East London

Build-to-Rent — 280-unit block, East London

Communal rooftop array sized to building-attributable share. 90 kWp PV with PPA agreement — operator owns array, tenants get 15% discount on grid rates through smart sub-meter. Scheme's annualised EPC: B+ across all flats.

Read full case study →
FHS 2027 deadline approaching

Get an FHS-compliant solar quote in 48 hours

Tell us your plot details — ground floor area, location and target start-on-site date. We return a fully-costed system sized to Part L 2026 (40% PV rule), with the SAP/HEM compliance pack included.